Commercial | Restaurant Roofing Contractors in Grand Rapids
Burger King - Grand Rapids
126 NE 4th St • Grand Rapids, MN 55744
Roofing Project Details
We are proud to have completed the Burger King roofing project in Grand Rapids.
Type: Flat Roof
Year Installed: 2013
Approximate Square Footage: 4,000
Insulation: 1/2" Duro-Guard Fan Fold Insulation
Roof System: 50 Mil White Mechanically Fastened Duro-Last 20 Year NDL Warranty
General Contractor: G4 Construction Management-Minneapolis, MN
Architect: ONE! Architecture-Phoenix, AZ
In 2013, Nasi Roofing LLC was hired to install a new Duro-Last roofing system. The new custom prefabricated mechanically fastened Duro-Last roofing system was installed with all pipes, chimneys, vents, and flashing ordered to fit. This reduced the amount of field seams, allowing the roof to be installed quickly and a high level of quality maintained. Upon Completion the roofing system was inspected by a Duro-Last Roofing Technical Representative, and a 15 Year No Dollar Limit (NDL) Warranty was provided. This warranty is transferable, and has no exclusions for ponding water, and provides coverage against consequential damages that result from defects in the Duro-Last Material and/or installation workmanship. Duro-Last also has 20 year warranties available.
Request a roofing estimate