Commercial | Metal Building Roofing Contractors in Rhinelander
Hodag Country Fest
5476 River Rd • Rhinelander, WI 54501
Roofing Project Details
We are proud to have completed the Hodag Country Fest roofing project in Rhinelander.
Type: Metal Roof Retrofit
Year Installed: 2007
Approximate Square Footage: 4,000
Insulation: 1/2" Duro-Guard Fan Fold Insulation
Roof System: 40 Mil White Mechanically Fastened Duro-Last 15 Year NDL Warranty
In 2007, Nasi Roofing LLC was contracted to install a new Duro-Last roofing system over the existing metal roof. Precut EPS insulation fillers were installed inside the metal ribs, and an additional layer of insulation was installed to create a flat surface for the new Duro-Last roofing system. The increased r- value reduced the heat loss and ice build-up on the roof. Upon completion the roofing system was inspected by a Duro-Last Roofing Technical Representative, and a 15 Year No Dollar Limit (NDL) Warranty was provided. This warranty is transferable, has no exclusions for ponding water, and provides coverage against consequential damages that result from defects in the Duro-Last Material and/or installation workmanship. Duro-Last also has 20 year warranties available.
Request a roofing estimate